Pin Oak Drive

The City installed reinforced concrete pavement and concrete pipe, modify existing culverts, desilt ditches, performed associated pavement repair, and completed associated appurtenances. Construction took place at the following locations within the city: Pin Oak Dr. from Gill Road to Magnolia Bayou; Oak Dr. from Pin Oak Dr. to Sunset Dr.; 23rd St. from Timber Dr. to Hwy 3; 25th St. from Ave H. to Hwy 3; 26th St. from Ave I to Hwy 3.

This project benefited eight hundred fifty-five (855) residents. Of these residents, two hundred eighty (280), or thirty-two and seventy-five hundredths percent (32.75%), are of low to moderate income. This project will serve the Urgent Need National Objective per the GLO.